日韩AV无码一区二区三_亚洲成av无码不卡_日本亚洲欧美在线视观看_又爽又高潮的视频国产

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.